Graphical display of results by searched conditions
Summary results by searched conditions
Tenderer institution no. |
Successful Bidder /Supplier / Provider |
No. of announced tenders |
Total limit fund of tenders (in ALL, without VAT) |
No. of tenders declared with winner (in ALL, without VAT) |
Total limit fund of tenders declared by winner (in ALL, without VAT) |
Awarded total value (in ALL, without VAT) |
43 |
NOVATECH STUDIO |
345 |
79,041,602 |
344 |
78,607,542 |
71,478,745 |
Tenders list
Procuring Authority by Local Government Entity |
Tender object |
Estimated / Ceiling Value ALL without VAT ALL |
Stage Procedure |
Successful Bidder /Supplier / Provider |
Awarded value |
Local Unit Patos |
Supervizim ne objektin “Rikonstruksion i rruges “Rrapi Tiku. |
306,403 |
Signed the Contract |
NOVATECH STUDIO |
72,500.00 |
Local Unit Lushnje |
Hartimi i Planeve të Rilevimit të fshatit Çinar të NJ.A. Fiershegan në kuadër të procesit ligjor të përmirësim-përditësim, të regjistrit fillestar të pasurive dhe çertifikimit të tyre sipas AMTP-ve në zbatim të VKM – së Nr. 994 datë 09.12.2015. |
800,000 |
Signed the Contract |
NOVATECH STUDIO |
390,000.00 |
Local Unit Kamëz |
Mbikqyrje e punimeve për objektin: Punime Pastrim Kanale Kulluese, Bathore, Frutikulturë |
18,747 |
Signed the Contract |
NOVATECH STUDIO |
6,300.00 |
Local Unit Pukë |
Mbikqyrje punimesh per Objektin : Ndertim palestre prane shkolles Sabah Sinani dhe Migjeni, Bashkia Puke |
700,000 |
Signed the Contract |
NOVATECH STUDIO |
187,000.00 |
Local Unit Tropojë |
Kolaudim objekti: Rehabilitim i Shëtitores së qytetit Bajram Curri |
138,821 |
Signed the Contract |
NOVATECH STUDIO |
32,000.00 |
Local Unit Berat |
Supervision of workings in the facility: Reconstruction of the road Old Stadium-New Stadium, Stadium road, Koli Vesho road and the Square in front of the Stadium - Financed from Berat Municipality income |
2,465,050 |
Signed the Contract |
NOVATECH STUDIO |
727,188.00 |
Local Unit Pogradec |
Supervision of the facility: Retaining walls at Gwshtenjas river |
166,667 |
Signed the Contract |
NOVATECH STUDIO |
49,000.00 |
Local Unit Selenicë |
Offices supervision |
10,000 |
Signed the Contract |
NOVATECH STUDIO |
1,900.00 |
Local Unit Berat |
Supervision of workings for the New Municipality of Berat reconstruction |
1,336,830 |
Signed the Contract |
NOVATECH STUDIO |
561,469.00 |
Local Unit Kamëz |
Supervision of a pedestrian road construction at Razem tourist resort |
196,272 |
Signed the Contract |
NOVATECH STUDIO |
77,770.00 |
Local Unit Tiranë |
Lot 2:Supervision of the works for the building: Redevelopment of the school sports field in Petro Nini Luarasi school |
352,000 |
Signed the Contract |
NOVATECH STUDIO |
133,333.00 |
Local Unit Berat |
workings check-out into the facility: Reconstruction of roads at D. Kastrioti Neighborhood |
74,485 |
Signed the Contract |
NOVATECH STUDIO |
31,900.00 |
Local Unit Berat |
Check up of workings for the reconstruction of sidewalks, railings and lighting in Ura e Varur-Ura e Gorices segment, Berat. |
93,600 |
Signed the Contract |
NOVATECH STUDIO |
39,990.00 |
Local Unit Kamëz |
Supervision of workings for the object: construction of waste water channel at Paskuqan1 and Ibrahim Rugova2016 road. |
143,301 |
Signed the Contract |
NOVATECH STUDIO |
32,990.00 |
Local Unit Kamëz |
Construction of waste water channel at Fierz Kamwz 3 road |
20,430 |
Signed the Contract |
NOVATECH STUDIO |
11,300.00 |