Open Procurement Albania

Site Management, Interpretive, and Visitor Experience Plans for Zvërnec – Narta & Bënja Thermal Waters touristic sites , consulting services

District Vlore-Gjirokaster
Loan No 8656- ALB
Source of Loan/Financed by: World Bank
Loan Amount by Currency 63.8 milionë Euro
Project Title Project for Integrated Urban and Tourism Development (PIUTD)
Description of the Project Budget: 63.8 million Euros
Financed by: World Bank
Timeline: 2017 – 2022. The project has become effective in April 2017 and shall take 5 years.
Geographic coverage:3 regions (Vlora, Berati, Gjirokastra); 4 municipalities (Saranda, Gjirokastra, Berati, Përmeti) and the tourist corridor going through this region.
Beneficiaries: 84 thousand inhabitants and about 300 thousand tourists.
Objective: Improve urban infrastructure, promote tourism, and strengthen institutional capacities to support tourism and develop the local economy in selected areas in the south of Albania.

Component 1. Urban design and improvement of infrastructure
Finances the drafting of projects for the implementation of urban projects and for improving the municipality infrastructure in four urban centers: Saranda, Gjirokastra, Berati, and Përmeti.
Investments in these selected municipalities shall include the rehabilitation of the following:
  • Public spaces (e.g. parks, squares, pedonale / pedestrian streets (pedestrian streets);
  • Road network, intermodal junctions and accompanying infrastructure (.e.g. sidewalks, crossroads, road lights, bicycle lanes, bus stations);
  • Restoration of selected buildings of heritage and facades of selected buildings;
  • Improve tourist areas (e.g. entry roads, visitor centers, parking places, tourist road signs).
  • Rehabilitation of the water supply shall be supported accordingly.
This component shall also finance the preparation of urban projects, feasibility studies, engineering projects, and the supervision of construction projects; the underground infrastructure shall be part of the improved road network, when necessary.

Component 2. Improvement of touristic sites
Finances investments intended at improving tourist sites to be selected along the touristic corridor in the South Albania. Investments shall include the restoration of objects of cultural heritage and asset, and the improvement of the support infrastructure. This component is also going to finance the preparation of the visibility studies, site management plans, engineering projects, and supervision of construction projects.

Component 3. Tourism and product development market
This component is going to finance capacity building activities for improving municipality management and tourism-based local economic development.
Tender object Site Management, Interpretive, and Visitor Experience Plans for Zvërnec – Narta & Bënja Thermal Waters touristic sites , consulting services
Reference No. AL-ADF-67670-CS-CQS
CPV Code
Estimated / Ceiling Value ALL without VAT
Type of Contract
Procurement Method
Stage Procedure Announced the Winner
Tender Announcement Date 28-06-2018
Opening Date for Submission of Bids 28-06-2018
Closing Date for Submission of Bids 13-07-2018
Sector
No. of Bidders
Bidders
Successful Bidder /Supplier / Provider
  • ABKONS  -
  • METRO_POLIS -
  • The winning bid ALL without vat 94,614 euro
    Bidder Announcement date
    Contract date
    Contract Value including VAT
    Contract Milestones Due Dates Site Management and Design Services should be performed within 4 months period,and the level of inputs required is 13 man/months. The firm will be contracted for thedesign phase under a lump sum contract.
    Supervision Services should be performed within 11 months period, and the level ofinputs required is 14 man/months. The firm will be contracted for the supervisionphase under a time base contract.
    Appeals
    Cancellation reason
    Notes The selection method to be applied for this services through Consultant Qualifications selection procurement procedure (CQs), in accordance with the procedures set out the World Bank’s Guidelines Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers (January 2011, revised July 2014).
    Transaction / Actual Spending Monitor treasury transaction for METRO_POLIS viti 2012-2013
    Monitor treasury transaction for METRO_POLIS viti 2014
    Monitor treasury transaction for METRO_POLIS viti 2015-2018
    Monitor treasury transaction for METRO_POLIS viti 2019-2020

    Relevant published Bulletin
    Tender Announcement
    Announcement of Winner
    Announcement of Contract Signing
    Njoftim për Shpallje Tenderi Nderkombetar

    Rregjistri i Kontratave -FSHZH

    Privacy Policy

    Except when otherwise defined, all data & information offered in Open Procurement Albania is available under the licenses: This material is Open Data