Open Procurement Albania

Urban Requalification Works in Puka Municipality (second phase).
Punime per Rikualifikimin Urban të Bashkisë Pukë (faza e dyte).

A Red Flag is a fact, event, or set of circumstances, or other information that may indicate a potential legal compliance concern for illegal or unethical business conduct, particularly with regard to corrupt practices and non-compliance with anti-corruption laws.

  • Lack of competition
  • Procurement takes place with one single competitor. The Albanian law does allow for such procedures, but what such procedures often demonstrate, more than just lack of competition, is criteria and application deadlines that are obviously in favor of a certain company (clientelism). Such tenders deserve to be considered exposed to risk.

District Shkoder
Loan No ALB – LD 1853
Source of Loan/Financed by: Council of Europe Development Bank (CEB)/ Western Balkans Investment Framework WBIF
Loan Amount by Currency 36.7 milionë Euro
Project Title Community Works IV: Development of the Albanian Alps and Coastal Areas
Description of the Project Budget: 36.7 million Euros
Financed by: Council of Europe Development Bank (CEB), the Albanian Government and beneficiary LGUs, and the Western Balkan Investment Framework (WBIF).
The sources of financing include 28.7 million Euros from CEB, a 1 million Euros grant from CEB Social Dividend Account (SDA), a contribution of 6 million Euros from the Government of Albania and the beneficiary LGUs, as well as a 1 million Euro grant from the WBIF for Alps Masterplan. It is foreseen that two thirds of the Program cost shall be invested in the South Coastline Area, and one third in the Albanian Alps.
Timeline: Starts in 2015 and ends in 2019, a timeline of 5 years.
The objective of the Community Works IV Project - "Development of the Albanian Alps and Seaside Area" is to promote a sustainable social and economic development in communities of significant tourist potential. This is to be achieved through an improved integrated public infrastructure, respecting the environment and preserving the cultural and historical heritage.
The project components include:
  • investments in infrastructure and local public services (urban and road re-qualification, drinking water supply-sewerages, management of urban waste, etc.);
  • technical assistance & capacity building (feasibility studies, preparation of local strategies, drafting of projects, and training).
Tender object Urban Requalification Works in Puka Municipality (second phase).
Punime per Rikualifikimin Urban të Bashkisë Pukë (faza e dyte).
Reference No. REF No: CWPIV/W/OP/2018/18
CPV Code
Estimated / Ceiling Value ALL without VAT
Type of Contract
Procurement Method
Stage Procedure Announced the Winner
Tender Announcement Date 15-01-2019
Opening Date for Submission of Bids 15-01-2019
Closing Date for Submission of Bids 18-02-2019
Sector
No. of Bidders 1
Bidders Alba Konstruksion
Successful Bidder /Supplier / Provider
  • ALBA KONSTRUKSION -
  • The winning bid ALL without vat 88,928,369
    Bidder Announcement date 26-02-2019
    Contract date
    Contract Value including VAT
    Contract Milestones Due Dates 6 muaj
    Appeals Nuk ka pasur ankesa.
    Cancellation reason
    Notes The duration and summary scope of the contract:
    The construction period is 6 months. The works consists in the rehabilitation of road connection to Puke Hospital. The project foresees the construction of drainage and footpaths. The project also takes into account the construction of lighting, greening and vertical and horizontal sign.

    The project foresees the plastering and painting of the existing old building facades including thermic insulation and in the same time preserving their architectural characteristics. Also new roofs will be constructed in accordance with the old methodology. Also, the project foresees the systematization and Lake protection works.

    Required works are mainly earth works and landscaping, site systematization, the construction of a lake protection through concrete works and paving works.

    The Site is located at Puka municipality.

    Bidding will be conducted through open tender procedures based on the CEB’s Guidelines for Procurement of Supplies, Works and Services, September 2011 and is open to Bidders from any country, in accordance with the provisions on eligibility in the CEB’s Guidelines for Procurement of Supplies, Works and Services, September 2011.
    Transaction / Actual Spending Monitor treasury transaction for ALBA KONSTRUKSION viti 2012-2013
    Monitor treasury transaction for ALBA KONSTRUKSION viti 2014
    Monitor treasury transaction for ALBA KONSTRUKSION viti 2015-2018
    Monitor treasury transaction for ALBA KONSTRUKSION viti 2019-2020

    Relevant published Bulletin
    Tender Announcement
    Announcement of Winner
    Announcement of Contract Signing
    Njoftim për Shpallje Tenderi Nderkombetar

    Njoftim për Shpallje Fituesi Tenderi Nderkombetar

    Privacy Policy

    Except when otherwise defined, all data & information offered in Open Procurement Albania is available under the licenses: This material is Open Data