Open Procurement Albania

Construction of bridge no. 2, km 7+500, Fier – Seman Road

District Fier
Loan No 8850-AL
Source of Loan/Financed by:
Loan Amount by Currency
Project Title Regional and Local Roads Connectivity Project (RLRCP)>/b>
Description of the Project Regional and Local Roads Connectivity Project (RLRCP) marks an important step for the benefit of citizens. It foresees an impact on the potential growth of agricultural and tourism activities by improving access to selected areas, as well as strengthening the capacity of municipalities to manage their road assets.
  1. Budget: 50 million USD.
  2. Duration: 2018 - 2022
  3. Funder: World Bank
  4. Geographical extent: 3 districts (Fier, Korça, Shkodra); 3 municipalities (Fier, Pogradec, Shkodra)
  5. Beneficiary: 80,000 inhabitants
  6. Program Objective: Improve access to selected agricultural centers and tourism and strengthening the capacity of municipalities to manage their road assets.
The program is built on two main pillars: reducing time and cost travel due to better and faster routes; and the link added to tourist centers and agricultural producers' access to markets and agro-processing centers.
Tender object Construction of bridge no. 2, km 7+500, Fier – Seman Road
Reference No. RLRCP/1/1.13/2021
CPV Code
Estimated / Ceiling Value ALL without VAT
Type of Contract
Procurement Method
Stage Procedure Announced the Winner
Tender Announcement Date 22-04-2021
Opening Date for Submission of Bids 22-04-2021
Closing Date for Submission of Bids 03-06-2021
Sector
No. of Bidders 4
Bidders 1. “4 A-M” shpk
2. “Alb Building” shpk
3. “Alb-Star” shpk
4. “Strabag AG”
Successful Bidder /Supplier / Provider
  • 4 A-M  -
  • The winning bid ALL without vat 1,694,315.33 US$
    Bidder Announcement date 29-07-2021
    Contract date
    Contract Value including VAT 2,033,178.4 US$
    Contract Milestones Due Dates 6 months
    Appeals Nuk ka pasur te skualifikuar.
    Cancellation reason
    Notes This project lies in the central-southern area of Albania. The bridge is located in the segment Fier Seman Road and it is in the cross point of Seman and Darezeze village. There is actually an existing bridge crossing the big irrigation channel. The technical parameters of the bridge are not good, as the width is reduced and is a one lane bridge.

    This project lies in the central-southern area of Albania. The bridge is located in the segment Fier Seman Road and it is in the cross point of Seman and Darezeze village. There is actually an existing bridge crossing the big irrigation channel. The technical parameters of the bridge are not good, as the width is reduced and is a one lane bridge.
    Transaction / Actual Spending Monitor treasury transaction for 4 A-M  viti 2012-2013
    Monitor treasury transaction for 4 A-M  viti 2014
    Monitor treasury transaction for 4 A-M  viti 2015-2018
    Monitor treasury transaction for 4 A-M  viti 2019-2020

    Relevant published Bulletin
    Tender Announcement
    Announcement of Winner
    Announcement of Contract Signing
  • Request For Bids
  • Contract Award
  • Privacy Policy

    Except when otherwise defined, all data & information offered in Open Procurement Albania is available under the licenses: This material is Open Data